Proven Success in
Challenging Environments

With more than 400 successful mast installations, Australian Wind Projects has delivered projects across Australia’s most diverse and complex terrain.

From 80m monitoring masts to 200m instrumented structures, our solutions are trusted by developers, contractors and financiers alike to provide accurate, bankable data and safe, sustainable installations.

Snowtown Wind Farm

Location: SA | Height: 100m

Australian Wind Projects delivered a 100m mast installation at Snowtown, completing the project under budget while achieving approximately 50% of the cost of alternatives. The installation provided stable, bankable data with zero safety incidents and met all client requirements for accuracy and compliance.

A worker performing maintenance on a tall wind monitoring system mast tower during sunset or sunrise.

Kennedy Energy Park

Location: QLD | Height: 120m

Installed in 2016, this mast remains perfectly aligned after more than
eight years of continuous operation. It continues to outperform a competitor’s mast installed on the same site in 2020, demonstrating the proven durability and reliability of our engineering.

View of a tall wind monitoring system mast tower stretching into a blue sky with some clouds, situated on a grassy hill with scattered trees.

Julia Creek Mast

Location: QLD | Height: 160m

Australian Wind Projects installed a 160m instrument height mast, ensuring full compliance with IEC standards and specific client requirements. The installationdelivered highly accurate, bankable data

to support critical decision-making for renewable energy development.

White Jeep parked on a grassy hill with rocks, next to a large wind monitoring system mast under a cloudy sky.

Prairie Region Masts

Location: QLD | Height: 150m

Successfully installed four masts (two
at 150m and two at 100m) in highly challenging terrain that included basalt and black soils. Helicopters were deployed to overcome logistical constraints, ensuring safe, efficient installation and reliable long-term project outcomes.

Aerial view of wind turbines in a dry rural landscape with a dirt road, under a clear blue sky.